Site storage
Contents |
[edit] Introduction
Site storage involves the provision of adequate space, protection and control for materials, components and equipment that are to be kept on a construction site during the building process.
There are several factors to be considered when deciding on the amount and nature of storage required.
- Physical properties: The size, shape, weight and mode of delivery.
- Organisation: The planning process to ensure unloading is available and storage space has been allocated.
- Control: Processes for checking the quality and quantity of materials on delivery, and monitoring stock holdings.
- Protection: The necessary protection for durable and non-durable materials and components from damage.
- Security: Guarding against theft and vandalism.
- Costs: Costs associated with handling, transporting and stacking requirements, the workforce required, heating and/or lighting that may be required, facilities to be provided for subcontractors, and so on.
- Processing: What needs to be done to materials before they can be used. Is there packaging that needs to be removed or returned?
- Programme: When are items required, what is the risk to the project of them not being available, how long in advance are they ordered and how long they will be on site.
- Ownership: Who is legally responsible for items, who will be using them and who owns them? See Materials on site for more information.
[edit] Site allocation
The location and size of space to be allocated should be planned carefully as part of an overall site layout plan and each site will present its own problems. Failure to adequately plan for storage space can result in congestion, or having more materials on site than storage space allows for.
The most appropriate position on site in terms of handling, storage and convenience should be determined. Unloading deliveries should take place in a clearly marked designated area, away from other site operations, supervised by a competent person.
The distance between storage areas and the area materials are to be used should be reduced as much as possible to keep the time and cost required to transport them from place to place at a minimum. Alternatively, storage areas could be positioned within the reach of a tower crane which can then be used to move materials as required.
[edit] Theft
Materials and equipment may need protection from theft and vandalism, particularly when left out in the open where they have the potential to be removed late at night by opportunistic thieves. Tradespeople often have heavy duty lockable compartments or vans for storing tools, but where it is more practical to leave equipment and materials on site, security may need to be provided. This can be in the form of a lockable fenced compound on site, perhaps with CCTV, alarms and patrols.
Close boarded fences are often used which are similar to hoarding, or chain link fencing with precast concrete posts, sometimes incorporating a 45° crank which faces out.
[edit] Health and safety
There are certain health and safety issues to consider when storing items on site. Items which are stacked must be stable to ensure they will not fall onto workers. Workers should not climb or walk on top of materials which are stacked as they could shift and cause them to fall.
Stored items should not block or obstruct escape routes.
The type of material being stored also needs to be taken into account. If it is hazardous, it may require specific precautions and control measures such as bunds for toxic substances or it may need to be kept separate from other substances to prevent a reaction.
To reduce the risk of an accident, special containers are required to store hazardous chemicals and dangerous goods. These types of containers may have special provisions for things like natural ventilation, special compartments, electrical earthing, and warning signs.
[edit] Materials storage
Different types of material will have different storage requirements, in particular depending on whether they are durable or non-durable.
[edit] Bricks
Bricks may be delivered to site loose or strapped in unit loads and stored on timber pallets to be transported using a forklift. Bricks should be stacked on edge in rows to a maximum height of 2.4 m. It is important that they are stored on level, well-drained ground and covered with a polythene sheet to protect against efflorescence and other issues. When calculating the area required for storage, allowance of around 5 m should be given for the forklift approach.
[edit] Blocks
Blocks may be delivered to site loose or strapped in unit loads on timber pallets. They should be stacked in columns, to a maximum height of 8 courses, and covered with a protective sheet.
[edit] Roofing tiles
Tiles may be delivered to site loose, in plastic-wrapped packs or in unit loads on timber pallets. They should be stacked vertically in rows, to a maximum of 6 in height. The tiles at the end of the row should be laid flat and staggered. Ridge tiles should be stored vertically on end.
[edit] Drainage pipes
These are usually supplied loose or strapped together on timber pallets. They should be stacked horizontally with ends reversed in alternate rows. A driven-in timber stack or column of loose bricks can be used to form end restraints.
[edit] Corrugated and similar sheet materials
These should be stored flat on a level surface and covered with a protective polythene sheet.
[edit] Timber
Timber and other joinery items should be stored horizontally and covered in a scaffold rack, although provision should be made for free air flow, usually by the rack having open ends and sides, while having a top that is covered. It is advisable for different timber sizes to be kept separate.
[edit] Cement
Since any contact with direct or airborne moisture can cause cement to set, it must be kept dry. In terms of organisation, it is advisable for a rotational system to be used, whereby the first batch of cement delivered is the first to be used.
Small quantities of bagged cement should be stacked to a height no more than 1 m, on a raised dry platform such as a timber pallet. A polythene sheet should be used as cover, with care being made to ensure that it is weighted down around the edges.
Medium quantities of bagged cement may need to be stored in a watertight and fireproof shed, with galvanized steel sides and adjustable legs on bearing plates.
Large quantities of loose cement should be stored in a cement storage silo.
[edit] Aggregates
It is essential for different aggregate types and sizes to be kept separate. They should be stored on a clean, hard, free-draining surface, surrounded by retaining and separating walls of bulk timbers. Stored aggregates should be regularly monitored for moisture content.
[edit] Related articles on Designing Buildings Wiki:
- Advance payment bond.
- Barcode.
- Construction consolidation centre (CCC).
- Construction logistics manager.
- Forklift.
- Just-in-time manufacturing.
- Laydown area.
- Lead time.
- Logistics management.
- Main construction compound.
- Materials on site.
- Off site materials.
- On site storage solutions.
- Retention of title.
- Site facilities.
- Site layout plan.
- Site office.
- Swarf.
- Vesting certificate.
[edit] External references
- ‘Building Construction Handbook’ (6th ed.), CHUDLEY, R., GREENO, R., Butterworth-Heinemann (2007)
Featured articles and news
Commissioning Responsibilities Framework BG 88/2025
BSRIA guidance on establishing clear roles and responsibilities for commissioning tasks.
An architectural movement to love or hate.
Don’t take British stone for granted
It won’t survive on supplying the heritage sector alone.
The remarkable story of a Highland architect.
The Constructing Excellence Value Toolkit
Driving value-based decision making in construction.
Meet CIOB event in Northern Ireland
Inspiring the next generation of construction talent.
Reasons for using MVHR systems
6 reasons for a whole-house approach to ventilation.
Supplementary Planning Documents, a reminder
As used by the City of London to introduce a Retrofit first policy.
The what, how, why and when of deposit return schemes
Circular economy steps for plastic bottles and cans in England and Northern Ireland draws.
Join forces and share Building Safety knowledge in 2025
Why and how to contribute to the Building Safety Wiki.
Reporting on Payment Practices and Performance Regs
Approved amendment coming into effect 1 March 2025.
A new CIOB TIS on discharging CDM 2015 duties
Practical steps that can be undertaken in the Management of Contractors to discharge the relevant CDM 2015 duties.
Planning for homes by transport hubs
Next steps for infrastructure following the updated NPPF.
Access, history and Ty unnos.
The world’s first publicly funded civic park.
Exploring permitted development rights for change of use
Discussing lesser known classes M, N, P, PA and L.
CIOB Art of Building photo contest 2024 winners
Fresco School by Roman Robroek and Once Upon a Pass by Liam Man.